Clay Brick Masonry Construction Process
Before the construction of clay bricks, first of all, clear construction tasks. Secondly, do the "three checks", i.e., check the personnel, check the material and check the site.
Before the construction of clay bricks, first of all, clear construction tasks. Secondly, do the "three checks", i.e., check the personnel, check the material and check the site. Next, make preparations to eliminate hidden dangers and minimize problems. Make a good plan to cope with possible accidents. Here's a brief look at the lightweight clay brick masonry construction process.
Check the refractory materials, construction machinery and auxiliary facilities and tools entering the site to make sure that their varieties, specifications, quantity and quality meet the construction requirements, and that the personnel and organizations involved in the construction meet the intended requirements.
Carefully inspect the clay brick construction site, observe whether the kiln is clean, whether the simplified body is deformed, whether the welds and connections are smooth, and whether the brick-blocking ring is perpendicular to the kiln axis. Requirements for adequate lighting, smooth transportation, complete tools, mechanical and electrical intact, complete personnel, in case of mechanical and electrical equipment and other failures can also be removed in a timely manner. According to the construction task and the actual situation of the site, prepare the progress plan of the masonry project, cross operation plan, make good preparations for the construction of technology, material and work, and formulate the plan in case of failure to ensure that the construction of clay brick kiln lining is carried out harmoniously and in an orderly manner and the quality is achieved.
Before the construction of clay brick, clean up the site, and then place the line. The longitudinal datum line of the kiln is placed every 1.5m along the circumference, and each line is parallel to the axis of the kiln. The circumferential datum line is placed every 10m, and each line is perpendicular to the axis of the kiln. In addition, also need to draw parallel to the ring or longitudinal datum line of the construction control line, construction control line every 1m put 1.
Clay bricks should be close to the kiln body, that is, the cold end of the brick is required to "four corners of the ground" (the big head and the kiln body between the full tight, do not leave a gap), the brick leaning against the tight, brick seam straight, the intersection of the circle quasi-quasi, locking the brick firmly, not a good place to ensure that the brick circle and the cylinder is reliable concentricity, the kiln lining structure is solid, so that the cylinder on the pressure on the brick circle as well as brick lining the internal stress is evenly distributed in the entire The pressure of the cylinder on the brick circle and the internal stress of the brick lining are evenly distributed in the entire lining on each brick to prevent stress concentration.
Clay Brick Masonry Construction Process
2023-10-10
Before the construction of clay bricks, first of all, clear construction tasks. Secondly, do the "three checks", i.e., check the personnel, check the material and check the site. Next, make preparations to eliminate hidden dangers and minimize problems. Make a good plan to cope with possible accidents. Here's a brief look at the lightweight clay brick masonry construction process.
Check the refractory materials, construction machinery and auxiliary facilities and tools entering the site to make sure that their varieties, specifications, quantity and quality meet the construction requirements, and that the personnel and organizations involved in the construction meet the intended requirements.
Carefully inspect the clay brick construction site, observe whether the kiln is clean, whether the simplified body is deformed, whether the welds and connections are smooth, and whether the brick-blocking ring is perpendicular to the kiln axis. Requirements for adequate lighting, smooth transportation, complete tools, mechanical and electrical intact, complete personnel, in case of mechanical and electrical equipment and other failures can also be removed in a timely manner. According to the construction task and the actual situation of the site, prepare the progress plan of the masonry project, cross operation plan, make good preparations for the construction of technology, material and work, and formulate the plan in case of failure to ensure that the construction of clay brick kiln lining is carried out harmoniously and in an orderly manner and the quality is achieved.
Before the construction of clay brick, clean up the site, and then place the line. The longitudinal datum line of the kiln is placed every 1.5m along the circumference, and each line is parallel to the axis of the kiln. The circumferential datum line is placed every 10m, and each line is perpendicular to the axis of the kiln. In addition, also need to draw parallel to the ring or longitudinal datum line of the construction control line, construction control line every 1m put 1.
Clay bricks should be close to the kiln body, that is, the cold end of the brick is required to "four corners of the ground" (the big head and the kiln body between the full tight, do not leave a gap), the brick leaning against the tight, brick seam straight, the intersection of the circle quasi-quasi, locking the brick firmly, not a good place to ensure that the brick circle and the cylinder is reliable concentricity, the kiln lining structure is solid, so that the cylinder on the pressure on the brick circle as well as brick lining the internal stress is evenly distributed in the entire The pressure of the cylinder on the brick circle and the internal stress of the brick lining are evenly distributed in the entire lining on each brick to prevent stress concentration.